-
A green building house in Teruel
By aktua on 28 May, 2015Year: 2014 Status: en proyecto Location: Mora de Rubielos, Teruel Design: AKTUA Project: AKTUA Construction: AKTUA Construction manager: AKTUA Energetic certification A, Zero energetic consumes House in the countryside with a holistic study with a healthy and harmonic house as a result. From a site studio we realize a bioclimatic design, that is the beginning for saving energy: the rooms are placed facing south to take profit of the […] -
Facade rehabilitation in Segorbe, Castellón
By aktua on 26 May, 2015Year: 2014 Status: built Location: Segorbe, Castellón Design: AKTUA Project: AKTUA The facade of a building dated in 1990 needs to be rehabilitated. Lime morter and silicatum painting has been used for repairing the humidity damages. The windows are made by wood. Some existing wooden doors have been reused. -
Bioclimatic House Castellón 2
By AKTUA on 6 January, 2014The staircase blends with the garden with vegetation covering it up as if looking for the sunlight -
Bioclimatic Building Bocharán
By AKTUA on 6 January, 2014It is not a group of flats, it is a community -